Laboratories
Davis, CA
Provided HVAC & plumbing design for new manufacturing lab. HVAC scope included special dust collection system (explosion proof), process chilled water system with one 60 ton & one 20 ton air cooled chiller, pumps, piping and controls. Plumbing scope included lab utilities.