CKC’s guardrails exceed UDOT standards for safety and quality.
CKC does great work, consistently and with top quality.
CKC always exceeds our standards.
The partnership we have with CKC makes for a really good construction process. A great team.
It’s the best gravel there is in the basin!
CKC always follows construction schedules and are very details oriented in their work.
Civic and Justice
Sacramento, CA
Existing dual duct constant volume HVAC system converted to dual duct VAC system. Tenants were relocated temporarily for portions of each floor as work was completed with the remainder of the building operational.