Military
Seal Beach, CA
Complete mechanical and electrical engineering for multiple buildings on the new ammunitions pier. HVAC was designed to provide more than 30% energy savings applying heat pumps with 100% economizers. Plumbing designed for 30% better water savings. Our electrical design for the new buildings, applied indirect LED lighting, task lighting, and daylight controls.