Laboratories
Davis, CA
The facility raises Delta Smelt. Design includes new submersible pumps for the entire site water distribution, distribution piping to the lab spaces, filtration and water temperature to the labs using heat pump chiller/heaters. HVAC for lab work spaces and lab fume hood system.